Currency MDL
Production and installation of lodges on wells order in Chişinău
Order Production and installation of lodges on wells
Production and installation of lodges on wells

Production and installation of lodges on wells

Reconfirm the price with seller
Seller
Moldova, Chişinău
(View map)
+373 
Display phones
Description
If you have decided to dig out well, then at the choice of site of well, you need to be guided by the following rules: 1 Construction of well is made in soil of undisturbed structure. As if the structure of soil is broken, then during works there will be collapse of walls of well that will lead to well curvature, and it is possible also to mixing of rings. 2. The distance from well to capital structures has to make from 3 to 5 m. It is connected with the fact that in the presence of sandy soil, and also quicksands behind walls of well there is soil razuplotneniye therefore there will be violation of stability of the basis of the next constructions. 3. The site of well needs to be removed as much as possible from available on site of septic tank and the sewerage
Contact the seller
Production and installation of lodges on wells
Production and installation of lodges on wells
Compare0
ClearSelected items: 0