Mastic roofing and waterproofing TechnoNIKOL No. 31
- Customer pickup,
- Courier
- In detail
Scope
Mastic for roofing and waterproofing works ISPOLZUYETSYA for:- devices of an obmazochny waterproofing internal rooms (bathrooms, floors of pools, balconies, cellars);
- devices mastic and repair of all types of roofs (in a combination to fiber glass fabric, rolled materials and without them;
- devices of protective layers of a roof;
- waterproofing protection of building constructions (the bases, cellars, piles, and other objects buried to the earth or contacting to the damp environment).
Works
Before application mastic needs to be mixed carefully, if necessary to dilute with a bituminous emulsion primer to the required consistence. The processed surface has to be dry, cleared of dust, oil and other pollution. Drawing on the bases with humidity no more than 15% is allowed. To apply mastic in layer-by-layer mechanized way or manually: a brush, the pallet, or in bulk with leveling by special fungi (raklyama). Mastic consumption on one layer no more than 1,5 kg/m ². Time of drying of one layer depending on thickness no more than 5 h. The general expense for the device of a mastic roof or a waterproofing of 4-5 kg/m ². Time of a final set of properties of 7 days. Range of temperatures of application from +5 °C to + 400C.
MASTIC CONSUMPTION:
for the device of a mastic roof - 3.8-5.7 kg/sq.m;
for the waterproofing device - 2,5-3,5 kg/sq.m
