Diesel steam generator PG-1000 in a block container
- Customer pickup,
- Courier
- In detail
(View map)
Burner Baltur TBL 85 P (Italy) |
Boiler KP - 900 (Kpa - 1.0) |
Pump Calpeda NMM 1/AE (Italy) |
Sand box |
Set of spare parts and accessories (explosive valve membrane made of KAON - 4mm - 3 pcs. , ruff for cleaning smoke tubes) |
Chimney section |
Deflector - spark arrester |
A set of hardware for installing a chimney (32 M12x30 bolts, 64 d12 flat washers, 32 d12 growers, 32 M12 nuts) |
Asboshnur for sealing the chimney SHAON - 4 |
Gate valve for steam outlet DN80 (swivel gate valve) |
Safety spring valve 17s28nzh (0.14MPa) |
Storage tank 1.5t |
Insulated block box |
PVC window |
Door |
Lighting block box |
Automation system |
Fuel tank with visual level control. Volume 600 l |
Water magnetizer |
Heat gun for easy starting and emergency heating |
Nameplates for the boiler and control cabinet |
Passport and instruction manual |
Gas burner TBG 85 P |
Combined gas - diesel burner |
Oil burner (spent fuel) |
Tank for heating water BV - 7 |
Diesel steam generator PG - 1000 is designed to work in conjunction with a concrete plant, performs the following functions:
- heating of inert sand, crushed stone in RBU bunkers
- concrete plant heating
- water heating at a concrete plant in the production of concrete.
The steam generator PG - 1000 for RBU produces steam using a steam generator, processing diesel fuel.
It is operated mainly in cold weather, for warming up sand, crushed stone, ASG and other inert ones. Steam is supplied for heating the dosing complexes of the DC RBU, which makes it possible to heat the bulk products.
Liquid fuel makes it easy to start the RBU steam generator in any frost and reach the rated steam production capacity.
The PG1000 steam generator is a block box containing equipment: a steam boiler on a frame, a burner, pumps, a water treatment system, and an automation system.
The PG - 1000 steam generator is equipped with a Baltur TBL 85 P diesel burner (Italy). Optionally, the steam generator is equipped with a gas burner.
All pumping equipment installed on the Calpeda steam generator (Italy). An additional backup pump Calpeda (Italy) is also installed in the basic configuration.
For more reliable operation with various types of water, a water treatment system with a magnetizer is already installed in the basic configuration.
For the operation of the steam generator with a concrete plant, it is necessary to connect electricity to 380 volts and water supply. In case of an emergency shutdown of the RBU or a planned shutdown for several days, it is not required to drain the water from the steam generator.
Внутри блок - бокса установлена "тепловая пушка" для обогрева ПГ перед запуском или на время простоя. Так же тепловая пушка может использоваться для аварийного отогрева парогенератора или трубопровода.
Парогенератор ПГ - 1000 уже готов к работе и не требует проведения пуско - наладочных работ и полностью готов к работ.
Парогенераторы ПГ - 1000 не подлежат регистрации в органах Ростехназора, т. к. рабочее давление парогенератора менее 0,07 МПа.
Особенности установки- Не подлежит регистрации В РосТехнадзоре
- Итальянская дизельная горелка Baltur (опционально газ)
- Насосное оборудование Calpeda (Италия)
- Система водоподготовки воды с омагничивателем
- Обшивка котла из нержавеющей стали
- Автоматический режим, высокое КПД - 90%
- Транспортные габариты, не требует наладки
- Гарантия 2 года
Характеристики установки
- Производительность пара max, кг \ ч1000
- Максимальное давление, МПа0,07
- Температура пара не ниже, С°120
- Водяной объем котла, м34,4
- Паровой объем котла, м31,56
- Вид топливадизель (опционально газ)
- Расход топлива, л \ час14,5 - 62
- Объем топки котла, м30,75
- Площадь нагрева котла, м22,1
- Давление топлива перед котлом, МПа1,0 - 1,6
- КПД, % 90
- Масса не более, кг5000
- Высота, мм2495
- Ширина, мм2270
- Длина, мм5500