Currency MDL
Correct order of installation of plastic windows buy in Chişinău
Buy Correct order of installation of plastic windows
Correct order of installation of plastic windows

Correct order of installation of plastic windows

In stock
Reconfirm the price with seller
Payment:
  • Cash,
  • Invoice payment,
  • Visa/Mastercard,
  • In detail
Shipping:
Seller
Moldova, Chişinău
(View map)
+373 
Display phones
12
12 years on Allbiz
Technical characteristics
  • Material window profileAluminum
Description
Correct order of installation of plastic windows is as follows:
  • check of compliance of the sizes of windows and window openings;
  • check of completeness of the order according to the consignment note;
  • quality check of windows, window sills, vodootliv (existence of scratches, chips, cracks);
  • preparation of a window for installation (removal of shutters, double-glazed windows, zasverlivaniye of necessary openings, installation of paroizolyatsionny materials);
  • dismantle of an old window, cleaning of a window opening of dirt, dust and not strong plaster coats;
  • fixing of a window in an aperture by means of special fasteners (an anchor bolt, an anchor plate, a wall screw);
  • warming of an assembly seam on window perimeter by means of polyurethane construction foam;
  • installation of a window sill and water outflow;
  • fixing of paroizolyatsionny tapes on a window slope;
  • adjustment of locking accessories;
  • cleaning of the room, carrying out of garbage;
  • demonstration to the client of work of a window.

After installation the window has to be in the closed state at least 1 days, it is necessary in order to avoid deformation of a window the extending foam.

Pentru detalii accesati site-ul companiei noastre.

Contact the seller
Correct order of installation of plastic windows
Correct order of installation of plastic windows
Shipping method
Payment method
Compare0
ClearSelected items: 0