Correct order of installation of plastic windows is as follows:
- check of compliance of the sizes of windows and window openings;
- check of completeness of the order according to the consignment note;
- quality check of windows, window sills, vodootliv (existence of scratches, chips, cracks);
- preparation of a window for installation (removal of shutters, double-glazed windows, zasverlivaniye of necessary openings, installation of paroizolyatsionny materials);
- dismantle of an old window, cleaning of a window opening of dirt, dust and not strong plaster coats;
- fixing of a window in an aperture by means of special fasteners (an anchor bolt, an anchor plate, a wall screw);
- warming of an assembly seam on window perimeter by means of polyurethane construction foam;
- installation of a window sill and water outflow;
- fixing of paroizolyatsionny tapes on a window slope;
- adjustment of locking accessories;
- cleaning of the room, carrying out of garbage;
- demonstration to the client of work of a window.
After installation the window has to be in the closed state at least 1 days, it is necessary in order to avoid deformation of a window the extending foam.